The northeast entrance to the Town Green prepared for concrete |
The southwest corner of the Town Green has been poured and is curing |
The eastern entrance to the Town Green is currently being poured |
Bollards have been installed on the southwestern entrance (closest to Sub Station II). They can be removed for normal use and installed to prevent traffic flow during events on the Green. |